top of page
Search
Writer's picturemikemccreery

Building Count

Updated: Jun 16, 2020

Dock Ward Generic + Special Condition

East Harbor - 112+10 Installed

Fisherman's Wharf - 112 + 7 Installed

South Dock - 124 + 6 Installed

North Dock - 125 + 3 Installed

The Shipyards - 42 Installed

Sail St - 92 + 3 Installed

The "Slide" -

Snail St 98 + 2 Installed

Net St 115 + 5 Installed

Slut St 106 + 0 Installed

Eel St 124 + *1 Installed

Tenderloin Dist 211 + 11 Installed


Alleytown

Drawnsword Alley 107 + 1 Installed

Picklock Alley 78 + 0 Installed

Spiderweb Alley 113 + 2 Installed

Candle Alley 103 + 2 Installed

Book St 160 + 0 Installed

Red Cloak Lane 133 + 0 Installed

1955


Castle Ward

The Reach 36 + 2 Installed

Old temple Lot 76 + 5 Installed

Cook St 72 + 5 Installed

2139+ 65 Total Installed = 2204


Definitions

Installed - The buildings have been completed and installed in the diorama.

Final Paint - The buildings are in the painting stage prior to installation. Primed - The buildings have been printed and primed and are ready for final paint.

Printed - The buildings have been printed and are ready for priming.

Designed - The buildings have been designed and are ready for 3d printing.

Coded - The buildings have been assigned a class, # of levels, and purpose and are ready for design.

Carded - The buildings have been issued a card along with roof alignment and measurements.

Dotted - The buildings have been individually identified on the map and issued a number.




20 views0 comments

Recent Posts

See All

Comments


Post: Blog2_Post
bottom of page