I have reached the first 1000 piece installation milestone for the houses today. Over 1050 now installed on the table. More than 1/2 way done with the dock ward. Now I figure there are between 6000 and 8000 houses on the table so I am also more than 10% totally completed. Still having fun with the design, paint and installation of these buildings.
top of page
bottom of page
Comments