top of page
Search

Milestones

  • Writer: mikemccreery
    mikemccreery
  • Jan 29, 2020
  • 1 min read

I have reached the first 1000 piece installation milestone for the houses today. Over 1050 now installed on the table. More than 1/2 way done with the dock ward. Now I figure there are between 6000 and 8000 houses on the table so I am also more than 10% totally completed. Still having fun with the design, paint and installation of these buildings.


 
 
 

Comments


Post: Blog2_Post
  • Facebook
  • Twitter
  • LinkedIn

©2019 by Uncle Mike's Shop. Proudly created with Wix.com

bottom of page