This is an enormous project and like most of them the methods and systems have to be set up in advance to ensure things move along smoothly. As things progress tweaks are going to have to be made with the system. Here is the current average goal schedule tracking a house.
1. Identify the house location on the map, assign it a number, measure and record the dimensions, select type of roof and orientation,select exterior building material and identify purpose of building. Based on purpose, direction and location of building identify locations of windows and doors.
2. Design building based on specifications in step 1.
3. Print building.
4. Prep and prime building.
5. Paint exterior cladding
6. Paint Foundation
7. Paint Roof
8. Paint chimney and accessories
9. Install house in diorama.
So if each step took a day we would be at 9 day turn around from start to finish. If I start doing 10 identifications, designs and prints per day I will need to paint 50 houses per day to get them through all those steps. We will see if I can keep up!
Bình luận